Tipping Fees

Tipping Fees

Metric Tonne= 2200lbs
Prices are subject to H.S.T.
Minumum Charge $10.00
Prices subject to change without notice.

Halifax (16 Mills Drive Goodwood, NS) Location

Material Fee
Asphalt/ Brick/ Concrete
$10.00 per tonne
Concrete with Rebar

(No Extruding Metal)

$25.00 per tonne
Concrete with Rebar

With Extruding Metal
Mesh or Rebar

$50.00 per tonne
Clean Asphalt Shingles

tarpaper, nails

$75.00 per tonne
Clean Wood, Brush, Leaves, Grass Clippings
$75.00 per tonne
Drywall, Painted and/or Treated wood

Any one item as listed above

$100.00 per tonne
Mixed Loads

Any combination of the items as listed including:  Ceiling Tile, Vinyl, Plastic, Glass, Insulation, Styrofoam, Tar & Gravel roofing, Carpet, Asphalt/ Brick/ Concrete, Concrete with Rebar,Concrete with Rebar With Extruding Metal, Mesh or Rebar, Clean Asphalt Shingles, tarpaper, nails, Clean Wood, Brush, Leaves, Grass Clippings, Drywall, Painted and/or Treated wood

$115.00 per tonne
Mixed Loads (burnt or containing inert material not considered construction or building debris)

Containing any of the items listed and/or burnt loads or loads containing inert material not considered construction or building debris ie: rubber, fiberglass etc

$125.00 per tonne

Dartmouth (188 Ross Road) Location

Material Fee
Asphalt/ Brick/ Concrete
$10.00 per tonne + $15.00 transfer fee
Concrete with Rebar

(No Extruding Metal)

$25.00 per tonne + $15.00 transfer fee
Concrete with Rebar

With Extruding Metal
Mesh or Rebar

$50.00 per tonne + $15.00 transfer fee
Clean Asphalt Shingles

tarpaper, nails

$75.00 per tonne + $15.00 transfer fee
Clean Wood, Brush, Leaves, Grass Clippings
$75.00 per tonne + $15.00 transfer fee
Drywall, Painted and/or Treated wood

Any one item as listed above

$100.00 per tonne + $15.00 transfer fee
Mixed Loads

Any combination of the items as listed including:  Ceiling Tile, Vinyl, Plastic, Glass, Insulation, Styrofoam, Tar & Gravel roofing, Carpet, Asphalt/ Brick/ Concrete, Concrete with Rebar,Concrete with Rebar With Extruding Metal, Mesh or Rebar, Clean Asphalt Shingles, tarpaper, nails, Clean Wood, Brush, Leaves, Grass Clippings, Drywall, Painted and/or Treated wood

$115.00 per tonne + $15.00 transfer fee
Mixed Loads (burnt or containing inert material not considered construction or building debris)

Containing any of the items listed and/or burnt loads or loads containing inert material not considered construction or building debris ie: rubber, fiberglass etc

$125.00 per tonne + $15.00 transfer fee